News

Over the evenings of the 11th and 12th September two new CALM Buoys for Waha Oil Company were transported on multi-axle hydraulic trailers to Jebel Ali port. they were then subsequently lifted into the cargo hold and onto the deck on the transportation vessel.

footer5.png
© 2018| EPC Solutions | Design and Hosting by The Zoo Group

Search